Wednesday, November 30, 2011

the pace picks up

Now that the drilling has been completed there seems to be a million things going on at once here at the well site.
We were checking people in and out all day at a regular rate and in between all that they were moving large loads of pipe to the rear pad. I lost count of how many loads the 2 flat bed semi trucks made down the access road. They worked until dark when the trucks left for the night. I have a feeling they will be back again at first light to finish the job.
The "casing crew" came in last night. Unfortunantly they spaced themselves about 45 minutes apart starting about 1 am so no nap time for me :-). They will be cementing the well casing in place so we are expecting the cement trucks to start making their runs in and out sometime today.
Evan from Gate Guard Services arrived yesterday morning in place of Hunter. He had a new water pump for us and it only took him a few minutes to remove the old one and install the new one. Hooray, we have water again :-) !
We got a call from our son back in Indiana and they were having the first big snow of the season. He said they already had at least 3" on the ground and it was still snowing. I always hated the first snow because it meant a lot of crashes on the roads. I guess people just forget how to drive on slick roads, assuming they knew how in the first place :-). We called our daughter who works in Indianapolis and checked on her. She said her normal 45 minute drive home took her twice as long and there were a lot of people that had slid off the road. She took her time and made it home safely. Hopefully they will have the roads cleared for her morning commute.
Looks like it will be a busy couple of weeks here at the gate until they get the rig moved. Hopefully once they start drilling again things will settle back down, I'll keep you posted.

Monday, November 28, 2011

drilling is done

Several of the crew left late this afternoon saying they may not be back. They all worked for one of the contractors and said the drilling is complete and they are moving on to other rigs. There is still a chance they could get assigned back here once the rig moves.
Yes, I said back here! Henry, the company man, showed up at our door and said they are going to drill the back pad and will be moving the rig later this week. Should be really interesting because he said they are not going to disassemble it. They will lower it onto two semi trucks, one facing east and the other facing west, and move it that way. I sure would hate to be the truck that has to go backwards all the way.
He said they will tear down a large portion of the fence so they can make the turn without doing too much maneuvering. This is the same fence they just finished building a couple of weeks ago!
The new well will probably just sit for a couple of months with little to no activity since the next stage would be to fracture the well. This process know as "fracking" actually fractures the rock surrounding the well pipe which allows the oil and gas to flow better. Since they are drilling another well in close proximity Henry does not think the fracking will start until the other well is drilled because one could interfere with the other.
Bottom line is we are staying put here until they finish drilling on the other pad and then will move with the rig to the next site. Well I guess we will move as long as they still want us :-).
We are having a problem with our fresh water system. I hooked everything back up this morning and kept getting leaks. The end of the hose provided by the company had some wear on the threads so I cut it off and used a repair kit to replace the end. This solved the problem so I went to bed. Turns out the end started leaking and Rudee had to shut the water off until I got up. Once I was up and showered (using the on board water) I replaced their hose with one of my own and it worked fine for a little while then would not flow. I tried different things but it would flow for a few minutes and then it would slow to a trickle. I checked their pump which is mounted inside the generator cabinet and it was almost too hot to touch. Rudee called Hunter, who services our equipment, and told him about our troubles. He said he will bring us another pump and hose first thing in the morning.
I guess this is another good reason to make sure we keep the tank on our 5th wheel full.
Henry said we would be able to take a day off while the rig is being moved and set up. He said Sunday and Monday would be the best days so we went ahead and made some plans. We will drive to San Antonio early Sunday afternoon, see some of the sites, spend the night and be back at the gate before dark on Monday. Should be a fun time and a welcome break. I'll keep you posted.

turn the heat back on!

Sunday was as expected, slow all day until after dark when the traffic picked up and the gate was pretty steady for the next several hours.
I posted that I was wondering why they would not just move the rig to the pad in the back of the property. Well Henry, the company man, told me yesterday that they are probably going to do just that. He said they received the permits to drill on pad C but thought that pad was "B" and there was another on somewhere else on the property. He took off in his Jeep looking for "pad C". Once he returned he was as confused as we are. He said the pad in back has 4 holes in it that should not be there and he did not find any other pads. At this point I don't know what to think and will just "go with the flow" :-)
If they do decide to drill the back pad, this would mean 2 active well sites on our gate and we should receive additional pay. I'm not sure how that works but will be checking it out with our supervisor once the move is finalized. I felt like the first couple of weeks here we should have been receiving a higher rate due to the construction on the back pad. At least 1/3 of our gate traffic was the construction crews not associated with our rig.
Henry did say they are with in 1000' of finishing this well. I'm assuming they will be making a decision fairly quickly on where the rig goes next.
The night crew is leaving for their week off as I write this. I have talked to a couple of them and they tell me the company man is telling them to report to the new site that is closer to Cotulla. The bad thing is no one seems to know where this site is. The workers say they will just call next week end and get directions.
The cold weather arrived as expected. I disconnected the water hose and drained it to keep it from freezing. The temps are supposed to be above freezing the rest of the week so I will re-connect it after it warms up some.
I did turn the furnace on to help us stay warm and of course one of our tanks of propane ran dry. The 5er is equipped with an automatic switch that changes the flow from one tank to another so you do not run dry. I have a monitor hooked up to the LP tank regulator that flashes a light when one tank runs dry and it switches to the full tank http://www.shoprvparts.com/product.do?no=17493F&WT.mc_id=gb1&utm_source=googlebase&utm_medium=productfeed&utm_campaign=googleshopping
I also carry an extra 30lb tank on the semi and another 20lb tank for the grille so I have plenty of LP storage :-).
We do have several electric heaters and we use those the majority of the time but I do run the furnace (on a low setting) when it drops below freezing because our 5th wheel has a vent in the underbelly to keep the pipes from freezing. The weatherman says the lows will be in the 30's for the next couple of days but they are not predicted to drop below the freezing mark again :-).
I am expecting a busy week here at the gate with a lot of "tear down" activity and big trucks coming in and out. I'll keep you posted.